You can copy an existing visualization on the Visualizations tab. After you copy a visualization, you can edit, update, or configure the new visualization as required.
- Go to Analyze > Scenario Visualizations.
- Click the Visualizations tab.
- In the Visualizations area, in the row of the visualization you want to copy, click the Actions icon, and then click Copy.
The Visualizations area is updated with the copy of the visualization.